7/11/2011
Topic:
Installation Requirements
Frank Alviani
|
Hi, What are the installation requirements for stress stimulus? I tried to install it on an HP thin client running embedded XP with .Net 4.0 and it failed to install. There were no error messages or feedback. Thanks in advance, Frank |
7/11/2011
Topic:
Installation Requirements
Frank Alviani
|
It has .Net v4 installed. The other properties are: Windows Embedded XP Standard SP3 CPU VIA nano u3500 @ 1GHz RAM 896 MB Thanks in advance. Frank |
7/11/2011
Topic:
Installation Requirements
Frank Alviani
|
Fiddler installed with no problems. Just can't install StresStimulus. |
7/11/2011
Topic:
Installation Requirements
Frank Alviani
|
1) .Net 2 was installed. 2) I was trying to install the program from a remote volume. When I copied the installer to the internal drive of the thin client the successful. Thanks for your assistance, Frank |
7/27/2011
Topic:
Several questions about test cases
Frank Alviani
|
I have several test case usage questions about StressStimulus:
1) I have a number of test cases that need to be combined in different ways. Let's call them A, B C for simplicity, and I need combinations ABC, BAC, CBA, etc. If I save A, B, and C separately, how can I combine them into single combined test cases?
2) I will be running load test cases from a number of computers. Are saved test cases linked to the IP of the machine where they were created - that is, can they only be run from that machine? If they are, is there a way to edit the IP so they can be run from other machines?
Thanks in advance, Frank Alviani
|
7/27/2011
Topic:
Several questions about test cases
Frank Alviani
|
Thanks - that's exactly what I was looking for. Frank |
8/6/2011
Topic:
Several questions about test cases
Frank Alviani
|
An additional question has come up about combining test cases. From your description of the process above, am I correct in thinking that the settings for "think time" time, etc. apply to all of the combined tests? It appears that each iteration of the test is for A immediately followed by B followed by C. Correct? Is it possible to set up a single combined script so that test A runs for a set amount of time (say 90 minutes), then test B runs for a set amount of time (say 60 minutes), followed by test C running for another amount of time (say 45 minutes)? Thanks, Frank |