HomeSUPPORT QUESTIONS

Need help with StresStimulus? Start here.

Setting up a load test Messages in this topic - RSS

Unregistered User
Unregistered User
Posts: 509


5/14/2020
Unregistered User
Unregistered User
Posts: 509
I need to perform stress testing for 3 hours 132 users x 20 transactions per hour. How can I set this up ?
0 link
George @StresStimulus
George @StresStimulus
Administrator
Posts: 554


5/14/2020
George @StresStimulus
George @StresStimulus
Administrator
Posts: 554
To satisfy 3 hours test duration requirement, you need to set Test completion condition to Run Duration and Load generation time to 3:00:00 in the Test Duration section as described http://support.stresstimulus.com/display/doc51/Run+Duration

To satisfy 20 transactions per hour requirement, you can use the pacing feature that is described http://support.stresstimulus.com/display/doc51/Delay+after+the+Test+Case It allows you to set the minimum time it takes to complete an iteration of a test case.

I am not familiar with the specifics of your test case, like how many transactions it has. But here's an example how can use the pacing feature:

If your test case has 5 transactions, to limit each VU to 20 transactions per hour, each VU can run 4 iterations per hour (20 transactions per hour divided by 5 transactions per iterations). To provide 4 iterations per hour, each iteration must take at least 15 minutes (900 seconds). Set the Minimum duration of the test case replay (s) to 900.
0 link






Copyright © 2024 Stimulus Technology