I need to perform stress testing for 3 hours 132 users x 20 transactions per hour. How can I set this up ?
|
|
0
link
|
George @StresStimulus Administrator Posts: 510
5/14/2020
|
To satisfy 3 hours test duration requirement, you need to set Test completion condition to Run Duration and Load generation time to 3:00:00 in the Test Duration section as described http://support.stresstimulus.com/display/doc51/Run+Duration To satisfy 20 transactions per hour requirement, you can use the pacing feature that is described http://support.stresstimulus.com/display/doc51/Delay+after+the+Test+Case It allows you to set the minimum time it takes to complete an iteration of a test case. I am not familiar with the specifics of your test case, like how many transactions it has. But here's an example how can use the pacing feature: If your test case has 5 transactions, to limit each VU to 20 transactions per hour, each VU can run 4 iterations per hour (20 transactions per hour divided by 5 transactions per iterations). To provide 4 iterations per hour, each iteration must take at least 15 minutes (900 seconds). Set the Minimum duration of the test case replay (s) to 900.
|
|
0
link
|
Copyright © 2023 Stimulus Technology