Need help with StresStimulus? Start here.
How to configure a test with 2 scripts
Unregistered User Posts: 475
11/3/2021
|
Could you please share the information how to build this scenario when I perform a load test for 1hr duration. Script 1 should run for 1 hr -5Vusers-1user with every 15mins Script 2 also run for 1 hr-5Vusers-1user with every 15mins Script should run only 10 iterations on 1hr.- 5Vusers -1user with 15mins
|
|
0
link
|
George @StresStimulus Administrator Posts: 511
11/3/2021
|
It sounds like you want to run a step load test with 2 test cases with 10VUs for 1 hour. Here are the settings: First set the load pattern to step load starting with 2VU and increase by 2 every 900 seconds (15 minutes) until reached 10 the following:
 Since you have 2 test cases with the same number of VUs, set the mix weight of both test cases to 1

Finally, since you want a maximum of 10 iterations for each test case, set the Maximum iterations property of each test case to 10 as described https://support.stresstimulus.com/display/doc54/Multiple+Test+Cases+Advanced
|
|
0
link
|
Copyright © 2023 Stimulus Technology